Project name:
Van Brienenoordbrug hindered maintenance work 2018
Location:
A16 at Rotterdam
Period:
2018
Description:
In 2018, dedicated maintenance work was carried out on the Van Brienenoord Bridge to keep the bridge safe and functional until the planned large-scale renovation. These activities include replacing bulbs under the deck, which was essential to the structural integrity of the bridge.
List of activities:
- Replacing bulbs under deck
- Inspection and maintenance of steel components
- Preventive strengthening of critical points
- Control and maintenance of movement works
Result:
The work carried out in 2018 has contributed to maintaining the safety and functionality of the Van Brienenoord bridge. These maintenance measures were necessary to keep the bridge operational pending the planned large-scale renovation, which has since started.