20240816_161452

PORTS OF TEXEL

Project name:

Rapid repairs Long Fiking .

Location:

Veerhaven Texel (TESO), The Netherlands

Period:

August September 2024 (length: 5 weeks)

Description:

During the summer of 2024 the long trap is a floating steel scaffold next to the eastern lifting tower of the ferry port on Texel . This trap plays a crucial role in the safe mooring of TESO ferries. The work was aimed at repairing damage and strengthening the steel structure.

List of activities:

  • Welding dozens of cracks in the uprights of the scaffolding
  • Development and placement of temporary storage containers to keep welders and preservatives out of the water
  • Performance of MT and UT studies on welding repairs and steel profiles
  • Local treatment and three-layer preservation of all repair sites

Result:

The hatch is fully restored within five weeks, without any inconvenience to the ferry service. These interventions will ensure the structural safety of the docking plant for the coming years.